Delivers Custom Solution Proposal with material reports:
E.g., vinyl ester resin withstands -40°C~150°C), load test predictions, and installation guidelines.
Prototyping & Performance Testing
(5-7 workdays)
Small-batch trial production (≥10 units) tested in-house;
Anchorage Force Test: Simulates 150% design load (static/dynamic);
Environmental Simulation: Salt spray (coastal corrosion resistance), thermal cycling (-40°C~150°C).
Mass Production & Flexible Manufacturing
Leverages 5,000-ton raw material inventory for dedicated production lines;
Supports multi-spec parallel production (e.g., elevator anchors + custom sleeves), with 30% of monthly 20-million-unit capacity allocated to custom orders.
End-to-End Quality Control
12-point inspections from raw materials to finished goods, including:
Thread precision (laser measurement);
Coating thickness (X-ray fluorescence);
Gel curing time for chemical anchors (temperature-controlled chambers).
Delivery & Installation Support
Provides custom installation guides (e.g., rotation speed ≤750 rpm, hole-cleaning standards) and video tutorials;
On-site technician support for large projects to ensure design compliance.
COMPANY CUSTOMIZED PRODUCT CASES
A Brazilian construction firm faced challenges during the renovation of a 1980s concrete curtain wall
Client Pain Points
⦁ Weak Substrate: Aged concrete strength: C20 (vs. modern C50 standard); standard nails caused cracking. ⦁ High Humidity & Corrosion: Tropical rainforest climate (85%+ humidity + salt spray) rusted carbon steel nails within 6 months. ⦁ Installation Constraints: Narrow frame gaps (≤30mm) required nails: 200mm length × ≤Φ6mm diameter.
⦁ Anti-crack high-low double thread structure (enhanced grip in weak concrete) ⦁ Ultra-slim shank (200mm × Φ5.8mm) with bend resistance ⦁ Tropical-grade anti-corrosion (salt spray test ≥1,000 hours)
Value Delivered
⦁ Cost Savings: Eliminated rework costs from cracking (saved >$12,000 USD). Extended maintenance cycle from 1 year to 5 years. ⦁ Accelerated Timeline: 3 workers completed 15-day workload in 6 days (150% efficiency gain).
Key Insight
For tropical aging structures, material + structure + process triple-customization outperforms single-parameter adjustments. Tedun’s Latin America Tropical Material Library includes zinc-nickel alloy coatings and humidity-resistant sealants for rapid deployment. This case demonstrates Tedun’s technical prowess in resolving extreme environmental and structural challenges.
CORE CUSTOMIZATION CAPABILITIES
Tedun’s strength stems from technology integration, engineering expertise, and agile production:
1. Rapid Patent-to-Product Conversion: Modular integration of 23 patents into custom designs
Flexible Production: 5,000㎡ factory enables small-batch agile runs (≤15-day lead time for ≤100k-unit orders); Hybrid material orders (e.g., carbon steel rods + stainless steel nuts).
Traceable Quality
Batch-specific Material Reports + Anchorage Force Certificates (GB/ETAG compliant); ISO triple-certification (9001/14001/45001) ensures process standardization.
3. Conclusion: Tedun’S Customization Value Proposition Centers On
Precision Response
Full coverage from seismic retrofitting to corrosive environments, backed by patent portfolio;
Q1: "My project involves unique substrates (e.g., low-strength concrete/hollow brick/high-temperature environments). Can you customize solutions when standard products fail?"
Q2: "How do you ensure customized products meet design loads? Is test data available?"