You are here: Home » Blogs » Service » A Brazilian Construction Firm Faced Challenges During The Renovation Of A 1980s Concrete Curtain Wall

A Brazilian Construction Firm Faced Challenges During The Renovation Of A 1980s Concrete Curtain Wall


Weak Substrate: Aged concrete strength: C20 (vs. modern C50 standard); standard nails caused cracking.

High Humidity & Corrosion: Tropical rainforest climate (85%+ humidity + salt spray) rusted carbon steel nails within 6 months.

Installation Constraints: Narrow frame gaps (≤30mm) required nails: 200mm length × ≤Φ6mm diameter.


Custom Requirements:

⦁ Anti-crack high-low double thread structure (enhanced grip in weak concrete)

⦁ Ultra-slim shank (200mm × Φ5.8mm) with bend resistance

⦁ Tropical-grade anti-corrosion (salt spray test ≥1,000 hours)


Tedun Technical Solution

Product Design:

Name: TEDUN-BR2025 Tropical Anti-Crack Concrete Nail

Structure:  

⦁ Head: Phillips drive (compatible with local impact drills)

⦁ Shank:

- Front 30mm: High-profile thread (pitch 2.5mm, depth 0.4mm) → Aggressive bite into weak substrate

- Middle 140mm: Double-low thread (staggered pitch 1.8mm/2.0mm) → Stress dispersion to prevent cracking

- Rear 30mm: Smooth shank → Accommodates frame expansion

Material:  

⦁ 4140 alloy steel + Hot-dip galvanizing (≥25μm) + Sealer coating → 3x salt spray lifespan


Patents Applied:

Dual-Thread Stress Dispersion Tech: Reduces substrate stress by 30%.

Stepwise Anti-Corrosion Process: Zinc layer + nano-sealer fills micropores; passes ISO 9227 salt spray test (1,024 hours).


Key Project Milestones

Phase Action Timeline Deliverables

Requirement Confirmation On-site substrate sampling (São Paulo lab) 3 days Concrete Strength Degradation Report

Prototype Design 3D modeling + FEA stress analysis 5 days Bend simulation video + load distribution map

Trial & Testing Brazil-simulated environment tests:

⦁ Damp heat cycling (40°C/95% RH)

⦁ Salt spray (1,024h) 12 days Test report compliant with NBR 15575 (Brazilian National Standard)

Mass Production & Delivery Dedicated line: 200k units; shipped to Port of Santos 18 days Portuguese installation guide + anti-counterfeit QR code


Performance Comparison (Tedun Custom vs. Local Brazilian Brand)

Metric Tedun Custom Nail Local Competitor Improvement

Tensile Strength 8.2 kN 5.6 kN +46%

Salt Spray Resistance 1,024 hrs (no rust) 480 hrs (partial rust) +113%

Substrate Cracking Rate 0% (C20 concrete) 15%~22% Fully resolved

Installation Efficiency ≤4 sec/nail ≥7 sec (frequent jamming) +75%


Value Delivered

Cost Savings:

Eliminated rework costs from cracking (saved >$12,000 USD).

Extended maintenance cycle from 1 year to 5 years.

Accelerated Timeline:

3 workers completed 15-day workload in 6 days (150% efficiency gain).


Tedun Customization Capabilities Validated

Rapid Patent Integration: Dual-low thread tech from design to mass production in 23 days.

Localization: Compatible with Brazilian tools (Phillips drive) & standards (NBR 15575).

Full Traceability: Laser-etched batch numbers; QR code links to coating thickness/test reports.


Key Insight: For tropical aging structures, material + structure + process triple-customization outperforms single-parameter adjustments.

Tedun’s Latin America Tropical Material Library includes zinc-nickel alloy coatings and humidity-resistant sealants for rapid deployment.


This case demonstrates Tedun’s technical prowess in resolving extreme environmental and structural challenges.


QUICK LINKS

PRODUCT CATEGORY

OTHER LINKS

Leave a Message
Contact Us
CONTACT US
 Phone: +86-186-2526-3814
 WhatsApp: +8618625263814
 Email: sales@tedunzg.com
 Address: 5F, South Building, Tiandu Building, No.211, Changjiang Road, Huqiu District, Suzhou, China
Copyright © 2025 TEDUN Fastener Manufacturing Co., LTD. All Rights Reserved.  苏ICP备2025200298号-1